Featured Image of Sattva Jodhani Completion Date

The Sattva Jodhani completion date is set for December 2031, giving buyers a clear five-year move-in plan for 750 homes on 6 acres in KIADB Bagalur, North Bengaluru. Built by the Sattva Group, this new high-rise project opens for sale in November 2026. The site holds 4 tall towers that stand between 30 and 35 floors high. Buyers can pick from 2 BHK and 3 BHK flats that range from 1,350 to 1,610 sq. ft. in size.

Prices start from ₹1.21 Crore*, and the land plan keeps about 125 homes on each acre. A huge 50,000 sq. ft. club sits in the center for all families to use. The team needs the full 60 months to dig the ground, pour the concrete floors, and fix all water lines. The state RERA filing is in progress right now to keep the work on time by law.

This long work plan lets the crew build each floor with care, test all wires, and pass every city check. Families who want a home near the airport road can use this date to plan their finances and bank loans.

When Is the Sattva Jodhani Completion Date and Handover?

The Sattva Jodhani completion date is set for December 2031, which gives the builder a full 60 months of build time after the November 2026 launch. This five-year plan gives the team enough room to build and check all four towers up to 35 floors.

  • Main Handover Date: December 2031 is the set target date to finish the work and hand keys to the buyers.
  • Pre-Launch Time: Late 2026 covers early soil tests, map checks, and initial boundary work on the land.
  • Open Market Launch: November 2026 marks the day when buyers can sign papers and machines roll onto the site.
  • Occupancy Certificate: City teams will check water pipes, fire pumps, and lifts before families move in by late 2031.

This set plan helps buyers track the work and know when they can move into their new flats.

Sattva Jodhani Construction Roadmap: Staged Handover Milestones

The Sattva Jodhani build schedule covers 5 full years from launch to key handover, dividing the work into clear steps for all four towers. Every single part of the build must pass tests before workers start the next job.

  • Ground and Base Work: Workers dig deep into the earth, drive heavy piles, and lay thick concrete slabs to hold up 35 floors.
  • Floor-by-Floor Frame: Crews pour strong concrete pillars, roofs, and walls, finishing about 3 or 4 slabs each month on each block.
  • Pipes, Wires, and Lifts: Teams run clean water pipes, pull electric wires, and fit fast lifts into all four tall towers.
  • Inside and Outside Work: Workers put up smooth wall plaster, lay shiny floor tiles, fit strong glass windows, and paint the outside walls.
  • Club and Road Work: The crew finishes the 50,000 sq. ft. club, paves internal paths, plants grass, and links the power substation.

Because each job runs on a set date, buyers can watch the towers rise floor by floor each month.

How Does Karnataka RERA Regulate the Sattva Jodhani Completion Date?

The RERA filing for Sattva Jodhani is currently in progress, and this official approval will turn the December 2031 possession date into a legal promise. The state RERA act protects all buyers by making the builder follow strict rules.

  • Safe Bank Account: The law says 70% of all cash paid by buyers must stay in a locked bank account used only for steel, cement, and wages.
  • Reports Every Three Months: The builder must upload fresh site photos, floor counts, and work notes to the RERA website every three months.
  • Firm Time Limits: The date listed on the RERA paper is a legal line, and builders must pay interest to buyers if they miss it.
  • City Living Pass: The builder cannot give keys to any buyer until city engineers check the site and sign the final Occupancy Certificate.

This legal cover gives peace of mind to buyers who book their homes early in the project.

Key Factors Determining the December 2031 Completion Timeline

The December 2031 timeline comes from the big job of building four tall towers up to 35 floors on a 6-acre piece of land. Building tall homes in North Bengaluru takes steady work and strict safety steps every day.

  • Tall Tower Work: Working 30 to 35 floors up takes extra time for concrete to dry and cure in high winds.
  • Material Trucks: Trucks carrying cement, sand, and steel bars must reach the site every week along the Bagalur roads.
  • Rainy Months: Deep ground work and basement digging must slow down when heavy monsoon rains hit the city.
  • Govt Checks: Getting green clearances, fire stamps, and power hookups takes a few months to clear before keys go out.

Taking 60 months to do all this work keeps the buildings safe, strong, and ready for decades of family life.

FAQs

The project completion and possession date is set for December 2031, allowing five full years of work after the November 2026 launch.

The RERA registration is in progress, and the state office will share the official RERA number as soon as the review ends.

The building work will run for 60 months (5 years), starting in November 2026 and ending in December 2031.

The project offers 2 BHK homes (about 1,350 sq. ft.) starting at ₹1.21 Crore* and larger 3 BHK homes (about 1,610 sq. ft.) with prices shared on call.

Yes, the December 2031 date covers all 750 flats, the roads, power setups, and the full 50,000 sq. ft. club.