Featured Image of Sattva Jodhani Possession Date

The Sattva Jodhani possession date is set for December 2031, giving buyers a clean 5-year timeline from its November 2026 launch on 6 acres in KIADB Bagalur, North Bengaluru. Built by Sattva Group, this new high-rise project brings 750 flats across 4 tall towers. Each tower rises from G+30 to G+35 floors.

Buyers can pick between 2 BHK and 3 BHK flats. Homes range from 1,350 sq. ft. to 1,610 sq. ft. Starting prices begin at ₹1.21 Crore*. The project has around 125 homes per acre. It also features a large 50,000 sq. ft. clubhouse.

The project has not launched yet. The state RERA team is checking the files right now. You will see the official RERA number very soon. A handover in late 2031 gives you plenty of time to set up your home loan. It also helps your family pay for the flat in easy, small steps as the work gets done.

Sattva Jodhani Key Dates and Handover Timeline

The official timeline gives key milestones from the first site launch up to final key handover:

  • Expected Project Launch (November 2026): Marks the public opening and the start of early buyer bookings for all 4 towers.
  • Ground and Base Phase (Early 2027): Covers deep earth digging and basement slab work across the entire 6-acre site.
  • Main Frame Construction (2028 – 2029): Finishes the concrete floor slabs up to the 35th floor on every tower.
  • Inside Brick and Pipe Work (2030): Builds solid room walls and lays water pipes, power cables, and fire lines for all 750 flats.
  • Official City Checks (Mid 2031): Brings city engineers to inspect the buildings for the official Occupancy Certificate (OC).
  • Final Possession and Keys (December 2031): Ends the 60-month build cycle with home walks and key handovers for every buyer.

60-Month Construction Milestones Leading to December 2031

Reaching the December 2031 date takes a clear five-year plan for all 4 towers:

  • Step 1 – Legal Papers (Late 2026): Securing the RERA number and city approvals before diggers start work on site.
  • Step 2 – Foundation Work (2027): Laying deep iron footings and building basement parking across the 6-acre plot.
  • Step 3 – Floor-by-Floor Slabs (2028 – 2029): Pouring concrete columns from the ground up to the 35th floor on all 4 towers.
  • Step 4 – Brick Walls and Wiring (2030): Building outer walls, plastering rooms, and running water lines through every unit.
  • Step 5 – Final Paint and Handover (2031): Setting up the 50,000 sq. ft. clubhouse, painting outer walls, and handing keys to buyers.

How G+30 to G+35 Elevation Affects the Possession Timeline

Building 4 towers up to 35 floors needs careful work, which sets the December 2031 timeline:

  • Concrete Drying Time: Each floor slab needs 15 to 20 days of water curing to turn rock hard before the next floor goes up.
  • Lifting Heavy Goods: Tall cranes must lift heavy iron, sand, and stone up 35 floors with great care each day.
  • Floor by Floor Pipe Checks: Pumping water and running main power lines up 35 floors needs full safety tests across all 750 homes.

Karnataka RERA Registration and Possession Enforceability

Karnataka RERA rules set the real legal handover date that the builder must follow:

  • A Lawful Handover Date: The date shown on the state RERA site is legally binding, keeping all 750 flat owners safe from delay.
  • Safe Bank Accounts: Under RERA law, 70% of buyer money stays in a locked bank account used only for site wages and materials.
  • Check Before You Buy: As RERA papers are in progress right now, buyers should check the official web page once the number comes out.

Financial Planning Around the 2031 Possession Date

A five-year delivery runway helps home buyers match their funds directly with actual site progress:

  • Phased Loan Release: Banks usually release home loan money in parts as major work stages are completed, such as the basement or roof slabs.
  • Lower Early Interest: Spreading payments over 60 months can help keep early loan interest lower.
  • Family Savings: Families who live in rented homes can use the time to save for stamp duty, registration, and home interiors before the planned handover in late 2031.

Buyer Milestone Checklist for the 2031 Handover

Buyers preparing for the December 2031 handover can protect their money with these simple steps:

  • Verify the RERA Record: Look up the project registration number on the Karnataka RERA portal as soon as it goes live.
  • Pay by Building Progress: Make sure your agreement ties cash calls to actual work, like base slabs or wall plaster, rather than fixed calendar dates.
  • Check True Flat Sizes: Compare the approved carpet area on the state portal against the pre-launch 1,350 to 1,610 sq. ft. figures before signing.
  • Collect the Occupancy Certificate: Make sure the builder secures the local civic Occupancy Certificate (OC) before you accept the keys in late 2031.

Sattva Group Prelaunch Project is Sattva Jodhani.

FAQs

The expected possession date for Sattva Jodhani is December 2031, following a 60-month build plan after its November 2026 launch.

Sattva Jodhani is in its pre-launch stage, and the official RERA registration is in progress, with the state number awaited.

The project will deliver 750 flats in 2 BHK (about 1,350 sq. ft.) and 3 BHK (about 1,610 sq. ft.) layouts across 4 towers.

Building 4 tall towers up to 35 floors needs steady time for strong foundation work, concrete drying, and full water and power tests.

Prices at Sattva Jodhani start at ₹1.21 Crore* for 2 BHK homes, while 3 BHK prices will be announced during the official launch.